Construction Experience

Thermal Power Plants

  1. In 2011-2010, our experts played a pivotal role in supervising the engineering, procurement, and construction phases of the Fast Track Emergency Power Project, involving the installation of four Gas Turbine Frame 9E units, each with a 125 MW capacity. The project, with a budget of US$350 million, included both civil and electromechanical work and utilized turbines manufactured by GE.

    image

Nuclear Power Plants

  1. In 2003-2004, our experts were actively engaged in the development of construction methodology, mix design, and the production of heavy concrete specifically designed for radiation shielding and High-Performance Concrete. This initiative was undertaken for a project involving a 2x220 MW power plant, with a total cost amounting to US$570 million.

    image
  2. In 2004-2005, our experts were actively engaged in the development of construction methodology, mix design, and the production of heavy concrete specifically designed for radiation shielding and High-Performance Concrete. This initiative was undertaken for a project involving a 6000 MW power plant, with a total cost amounting to US$2.6 billion.

    image

  1. The most extensive tunneling endeavor in India, involves the construction of a 12 km long, 10.15 m diameter headrace tunnel and a 300 m deep, 22.6 m diameter surge shaft. The total value of the contract surpasses US$300 million.

    image

Dams, Irrigation & Water Supply

  1. A joint project between Lesotho and South Africa, was constructed at a cost of US$1.5 billion. In 1998-2001, our experts played a crucial role in guiding the technical departments to facilitate the construction of Phase IB of the Lesotho Highland Water Project. The Mohale Dam features a primarily concrete face rock-fill dam (146 m high, utilizing 7.5 million cubic meters of rock fill and transition material), a concrete-lined ungated spillway spanning 300 meters, and two horse-shoe-shaped diversion tunnels.

    image
  2. The New Esna Barrage and Power Project in Egypt, was implemented with a budget of US$120 million. In 1989-1994,Our experts were responsible for overseeing Quality Control (QC), inspection, and the production of concrete and embracement materials.

    image

Sewage Treatment Plants

  1. With a budget of US$500 million, our experts were responsible for overseeing the design and construction of a water and wastewater treatment project, which included managing pumping stations, screening and filtering stations, primary/secondary sedimentation tanks, aeration tanks, and anaerobic digesters.

    image

Roads and transportation

  1. In 2015-2019, our experts led the management of the design and construction of a 55 km high-speed road network, with a budget totaling US$1.7 billion.

    image
  2. In 2000-2006, our experts played a role in the development of the Bandra-Worli Sea Link, a 5.6 km long, 8-lane wide cable-stayed bridge connecting Bandra in the Western Suburbs of Mumbai with Worli in South Mumbai. Notably, it stands as the longest sea bridge and the fourth-longest bridge in India.

    image

Township and Infrastructure

  1. With a budget of US$45 million, witnessed our experts optimizing team potentials for the project's execution. The areas covered included sewerage, stormwater, water supply, telecommunication, irrigation, electrical, gas, chilled water, and road networks.

    image

Repaire of Marine Structures

  1. Our experts took charge of restoring and repairing piers for King Abdulaziz Naval Base, involving a budget of US$75 million.

    image